A Montreal scrap yard switched from propane to natural gas by mounting 7 G-TEC cylinders on a pallet and moving them to wherever they are needed - one pallet cuts for 3 days then the cylinders are refilled overnight. With a Refueler 180 Cylinder Filling System it takes only 4½ hours!

Scrap yard flame cutting with high-pressure natural gas Flame cut non-ferrous metals with high-pressure natural gas

Natural gas cuts well on ferrous metal (above) or non-ferrous metals

with a powder torch (below).

Refueler 180 for scrap yard cylinder refilling Manifold 7 G-TEC cylinders for scrap yard cutting

A G-TEC Refueler 180 Cylinder Filling System connects to a standard low pressure utility natural gas pipe and fills Adsorbed Natural Gas Cylinders to 275 psi. Cylinders are manifolded together for a gas supply that can last up to three days before they need to be refilled.


And when the cylinders are empty they can be refilled overnight so they are full and ready to go back to work the next morning. Filling G-TEC Cylinders is automatic and does not need an attendant to monitor the process or turn the Refueler off when the cylinders are full.



Return To The Top Of This Page / Return To The Home Page

Refuelers let you fill

G-TEC cylinders with high

pressure natural gas

Order a G-TEC

Natural Gas

Pressure Booster

How To Install your

G-TEC System

G-TEC Systems are

Approved across the

US and Canada

Contact G-TEC

if you have questions

Torch Boosters

supply gas directly

to torches

Natural Gas Cylinders

hold high volumes of

natural gas at only 275 psi

Refuelers let you fill

G-TEC cylinders with high

pressure natural gas

Order a G-TEC

Natural Gas

Pressure Booster

How To Install your

G-TEC System

G-TEC Systems are

Approved across the

US and Canada

Contact G-TEC

if you have questions

Torch Boosters

supply gas directly

to torches

Natural Gas Cylinders

hold high volumes of

natural gas at only 275 psi